Canopy at uplift wind load
I have a 22*3 meter canopy attached to a building by tie rods as tension tie rods that attach the outer most part of the canopy back to the structure.
Due to wind uplift, this canopy may be lifted (theoretically), I notice it is a standard design what another engineer opinion about this?
Latest Post: Regarding the probably flexural strength of C5 Our newest member: Julian Rincon Recent Posts Unread Posts Tags
Forum Icons: Forum contains no unread posts Forum contains unread posts Mark all read
Topic Icons: Not Replied Replied Active Hot Sticky Unapproved Solved Private Closed
