Notifications
Clear all
Faults
Technical Issues
2
Posts
2
Users
0
Reactions
2,593
Views
Topic starter
08/02/2019 4:53 pm
Issue: a 1950’s building located smack bang over a fault having a recurrence period of between 3500 and 5000 years. It is not a major fault listed in AS 1170. NZBC B1 requires the building design to cater for a 500 year interval. So I can ignore the fact that a fault having a greater recurrence period is directly beneath? The MFE guidelines suggest that such an existing building is allowed.
Quote
11/02/2019 2:28 pm
I believe your interpretation is correct – the demand for assessment purposes is that defined by NZS 1170.5 (as at 1 July 2017), so any other factors need not be introduced.
ReplyQuote
Forum Information
- 3 Forums
- 89 Topics
- 207 Posts
- 1 Online
- 5,333 Members
Our newest member: Julian Rincon
Latest Post: Should we stop using NZS3603?
Forum Icons:
Forum contains no unread posts
Forum contains unread posts
Topic Icons:
Not Replied
Replied
Active
Hot
Sticky
Unapproved
Solved
Private
Closed
