Notifications
Clear all

Faults  

  RSS

Tim Pike
(@pike)
New Member
Joined: 8 years ago
Posts: 1
08/02/2019 5:53 pm  

Issue: a 1950’s building located smack bang over a fault having a recurrence period of between 3500 and 5000 years. It is not a major fault listed in AS 1170. NZBC B1 requires the building design to cater for a 500 year interval. So I can ignore the fact that a fault having a greater recurrence period is directly beneath? The MFE guidelines suggest that such an existing building is allowed. 


Quote
Nic Brooke
(@brooke)
Member Admin
Joined: 8 years ago
Posts: 38
11/02/2019 3:28 pm  

I believe your interpretation is correct – the demand for assessment purposes is that defined by NZS 1170.5 (as at 1 July 2017), so any other factors need not be introduced.


ReplyQuote
Share: